Apr 20, 2024
PRECISION TANK
One bay load out facility with eight 2,500-gallon chemical tanks going through a weigh pot to be injected into line and repack on a scale. Two 250,000-gallon field erected tanks in an earthen dike were existing (stored 32% and ATS)
1M FET and Load Out Building
Lines to Weigh Tank
Catwalk Stairway
Catwalk
Chem Tanks in Dike
Chem Load In - Repack
Chem Piping
Control Room
Inline Chem Meters
Load Out Bay
Load Out Building
Manifold Hot Load
Manifold
Repack Chem Load In
Weigh Tank
This facility was designed for speed and accuracy with the future in mind. Can load out in all three bays at once and still load In to the 1M FET.
www.precisiontank.com See all author stories here.
CEDAR COUNTY COOP > TIPTON, IAWHAT WE DESIGNEDPREVIOUSWHAT WE DID Four-Bay Building